Sunday, May 10, 2009

Road Maintenance & Rehabilitation (Info)

The combined effects of traffic loading and the environment will cause every pavement, no matter how well-designed/constructed to deteriorate over time. Maintenance and rehabilitation are what we use to slow down or reset this deterioration process. Maintenance actions, such as crack sealing, joint sealing, fog seals and patching help slow the rate of deterioration by identifying and addressing specific pavement deficiencies that contribute to overall deterioration. Rehabilitation is the act of repairing portions of an existing pavement to reset the deterioration process. For instance, removing and replacing the wearing course in a pavement provides new wearing course material on which the deterioration process begins anew. Reconstructing an entire pavement, however, is not considered rehabilitation but rather new construction because the methods used are generally those developed for new pavement construction.

No comments:

Post a Comment